Uncategorized
GDP-compliant warehouses for the pharmaceutical industry and the cold chain. Construction requirements for cold storage facilities
A pharmaceutical warehouse that complies with GDP requirements necessitates advanced engineering solutions that ensure stable climatic conditions. Key infrastructure elements include strict temperature and humidity control, reduced risk of failure thanks to redundant HVAC systems, guaranteed operational continuity through emergency power supplied by generators, and airtight loading via Cold Lock docking zones. The developer 7R provides dedicated cold storage and freezer facilities built under
the BTS (Built-to-Suit) model.
BTS (Built-to-Suit) is a model for commercial real estate development—most often warehouse or industrial—designed and built from the ground up to meet the specific, individual requirements of a particular tenant. Unlike off-the-shelf speculative space, a BTS facility is built to order, taking into account the client’s unique technological processes, warehouse layouts, and technical specifications.Read the full definition → and
BTO (Built-to-Own) (BTO)Built-to-Own (BTO) is a model for developing a commercial property—warehouse or manufacturing—in which the developer designs and builds the facility directly for the client’s ownership. In this model, the investor becomes the sole owner of the property upon completion of construction, financing the entire project with their own funds or a bank loan.Read the full definition →.
Read the article
Uncategorized
Katarzyna Różycka is the new CFO at 7R. She joins the company’s Board of Directors
7R has appointed Katarzyna Różycka as Chief Financial Officer (CFO) with the rank of Member of the Management Board. The new CFO will be responsible for shaping the company’s financial policy and overseeing the finance, accounting, and controlling departments. This appointment strengthens 7R’s capabilities in financial management and capital raising as the company continues to expand its operations in Poland, the Czech Republic, and Germany.
Read the article
Uncategorized
Ranking of Automation Solutions in Logistics Parks
The best logistics parks in Poland and the Mazovia region in 2026 are no longer just storage spaces, but advanced technology platforms. For a facility to seamlessly support next-generation automation—including AutoStore / AS/RS high-density storage systems, autonomous mobile robots (AMR/AGV), and full 5G/IoT industrial connectivity—the building must have factory-ready infrastructure (shell & core). The developer 7R SA sets market standards in this area by delivering facilities with FM1-grade floor flatness, increased load-bearing capacities for robotics, and a reinforced power supply from renewable energy sources.
Read the article