{"id":5035,"date":"2022-04-25T06:52:00","date_gmt":"2022-04-25T06:52:00","guid":{"rendered":"https:\/\/84.205.178.176:20443\/?p=5035"},"modified":"2024-04-04T11:58:46","modified_gmt":"2024-04-04T11:58:46","slug":"187045-fiege-moves-into-7r-warehouse-in-goleniow","status":"publish","type":"post","link":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/","title":{"rendered":"FIEGE moves into 7R warehouse in Goleni\u00f3w"},"content":{"rendered":"    <div class=\"post-text\">\n        <p><strong>7R has built a BTS format warehouse in Goleni\u00f3w for FIEGE, a leading European logistics operator. From the end of March FIEGE runs in Goleni\u00f3w an international distribution center, on an area of nearly 62,500 sqm., for a well-known global e-commerce giant.<\/strong><\/p>\n<p>FIEGE, a specialist in efficient logistic supply chain solutions, has chosen a modern warehouse in Goleni\u00f3w near Szczecin. The company is doing so due to the increasing needs of one of its key customers, a German mail-order retailer, and global e-commerce giant. This is already the 14th location of FIEGE in Poland.<\/p>\n    <\/div>\n\n\n    <div class=\"post-quote\">\n        <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"45.137\" height=\"37.635\" viewBox=\"0 0 45.137 37.635\">\n            <path id=\"Path_894\" data-name=\"Path 894\" d=\"M14.036-105.3H7.266v-18.055H25.321v13.6q0,22.447-18.055,24.033V-92.5q6.771-1.952,6.771-10.918Zm27.082,0H34.348v-18.055H52.4v13.6q0,22.447-18.055,24.033V-92.5q6.771-1.952,6.771-10.918Z\" transform=\"translate(-7.266 123.359)\" fill=\"#bcbec0\"\/>\n        <\/svg>\n                    <p>The choice of this location was driven primarily by two factors. Firstly, the analysis of the customer&#039;s business model, which resulted in the determination of the optimal area in terms of the customer&#039;s goods flow. Secondly, the possibility of obtaining synergy effects within existing operations. Goleni\u00f3w very much met both criteria.<\/p>\n                            <p class=\"h4\">Piotr Kohmann<\/span>\n                            <p class=\"h5\">CEO of FIEGE Sp. z o.o.<\/span>\n            <\/div>\n\n\n    <div class=\"post-text\">\n        <p>The investment has been developed in the Goleni\u00f3w Industrial Park. The BTS (Build-to-Suit) project prepared for FIEGE by the warehouse and industrial space developer, 7R, involves the construction of warehouse space, as well as office space (3,100 sq m). The facility is automated and equipped with a multi-level pick tower mezzanine, which increases FIEGE&#8217;s operational efficiency many times over.<\/p>\n<p>The storage height in the main part of the building will be raised to 12.2 m, while in the delivery and reception areas it will be 11.7 m. The facility has been designed in accordance with the latest technologies, stringent fire safety standards that meet FM Global standards, and in environmental terms in accordance with the requirements of BREEAM Excellent certification.<\/p>\n    <\/div>\n\n\n    <div class=\"post-quote\">\n        <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"45.137\" height=\"37.635\" viewBox=\"0 0 45.137 37.635\">\n            <path id=\"Path_894\" data-name=\"Path 894\" d=\"M14.036-105.3H7.266v-18.055H25.321v13.6q0,22.447-18.055,24.033V-92.5q6.771-1.952,6.771-10.918Zm27.082,0H34.348v-18.055H52.4v13.6q0,22.447-18.055,24.033V-92.5q6.771-1.952,6.771-10.918Z\" transform=\"translate(-7.266 123.359)\" fill=\"#bcbec0\"\/>\n        <\/svg>\n                    <p>We are delighted to have acquired another prestigious client, the global logistics operator FIEGE. From the technical point of view, we designed the building in close cooperation with the client in such a way as to enable the installation of modern technological solutions connected with the automation of logistic processes. As a developer, we have the know-how and experience to build specialized warehouses which are tailored to the requirements of each type of business, providing customers with space that meets the highest technical and quality standards.<\/p>\n                            <p class=\"h4\">Karol G\u00f3rnicki<\/span>\n                            <p class=\"h5\">Leasing Director at 7R<\/span>\n            <\/div>\n\n\n    <div class=\"post-text\">\n        <p>FIEGE and 7R have ensured that the logistics building is both environmentally friendly and comfortable for employees. A 50 KWp photovoltaic installation will cover the roof. The building&#8217;s energy efficiency is also positively influenced by the use of air temperature equalization destratifiers in the hall and LED lighting through a DALI system. Outside, there will be a recreational zone for employees, flower meadows, bird and insect boxes, as well as charging stations for electric cars. Rainwater will be used to water the green areas.<\/p>\n<p>The general contractor for the construction works is Goldbeck. The conceptual design of the building was made by 7R Architects. The entire investment is realized in the design-build format by Goldbeck.<\/p>\n    <\/div>\n\n\n    <div class=\"post-text\">\n        <p>&nbsp;<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n<h2>Attachments<\/h2>\n<ul>\n<li><a href=\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/FIEGE_moves_into_7R_warehouses_in_Goleniow.docx\">Press release EN<\/a><\/li>\n<li><a href=\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/Fiege_w_magazynie_7R_w_Goleniowie.docx\">Press release PL<\/a><\/li>\n<li><a href=\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/Fiege_Goleniow.jpg\" target=\"_blank\" rel=\"noopener\">Visualization<\/a><\/li>\n<\/ul>\n    <\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":21,"featured_media":4371,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-5035","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>FIEGE moves into 7R warehouse in Goleni\u00f3w - Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FIEGE moves into 7R warehouse in Goleni\u00f3w - Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-25T06:52:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-04T11:58:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1500\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Admin Delante\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin Delante\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/\"},\"author\":{\"name\":\"Admin Delante\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/ee45992ea97c22248abec8d01d4e80f0\"},\"headline\":\"FIEGE moves into 7R warehouse in Goleni\u00f3w\",\"datePublished\":\"2022-04-25T06:52:00+00:00\",\"dateModified\":\"2024-04-04T11:58:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/\"},\"wordCount\":8,\"image\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/\",\"url\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/\",\"name\":\"FIEGE moves into 7R warehouse in Goleni\u00f3w - Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w\",\"isPartOf\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg\",\"datePublished\":\"2022-04-25T06:52:00+00:00\",\"dateModified\":\"2024-04-04T11:58:46+00:00\",\"author\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/ee45992ea97c22248abec8d01d4e80f0\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage\",\"url\":\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg\",\"contentUrl\":\"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg\",\"width\":1500,\"height\":500},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.7rsa.pl\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"FIEGE moves into 7R warehouse in Goleni\u00f3w\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/#website\",\"url\":\"https:\/\/www.7rsa.pl\/en\/\",\"name\":\"Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w\",\"description\":\"Magazyny logistyczne i hale magazynowe do wynaj\u0119cia - 7R\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.7rsa.pl\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/ee45992ea97c22248abec8d01d4e80f0\",\"name\":\"Admin Delante\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/88ec0d5fda7c1ee1a35d15a6d518571b87e3b421d42e7307e6e0b0cdaffb86fd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/88ec0d5fda7c1ee1a35d15a6d518571b87e3b421d42e7307e6e0b0cdaffb86fd?s=96&d=mm&r=g\",\"caption\":\"Admin Delante\"},\"url\":\"https:\/\/www.7rsa.pl\/en\/blog\/author\/delante-dev\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"FIEGE moves into 7R warehouse in Goleni\u00f3w - Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/","og_locale":"en_US","og_type":"article","og_title":"FIEGE moves into 7R warehouse in Goleni\u00f3w - Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w","og_url":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/","og_site_name":"Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w","article_published_time":"2022-04-25T06:52:00+00:00","article_modified_time":"2024-04-04T11:58:46+00:00","og_image":[{"width":1500,"height":500,"url":"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg","type":"image\/jpeg"}],"author":"Admin Delante","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Admin Delante","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#article","isPartOf":{"@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/"},"author":{"name":"Admin Delante","@id":"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/ee45992ea97c22248abec8d01d4e80f0"},"headline":"FIEGE moves into 7R warehouse in Goleni\u00f3w","datePublished":"2022-04-25T06:52:00+00:00","dateModified":"2024-04-04T11:58:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/"},"wordCount":8,"image":{"@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage"},"thumbnailUrl":"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/","url":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/","name":"FIEGE moves into 7R warehouse in Goleni\u00f3w - Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w","isPartOf":{"@id":"https:\/\/www.7rsa.pl\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage"},"image":{"@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage"},"thumbnailUrl":"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg","datePublished":"2022-04-25T06:52:00+00:00","dateModified":"2024-04-04T11:58:46+00:00","author":{"@id":"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/ee45992ea97c22248abec8d01d4e80f0"},"breadcrumb":{"@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#primaryimage","url":"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg","contentUrl":"https:\/\/www.7rsa.pl\/wp-content\/uploads\/187044-aktu.jpg","width":1500,"height":500},{"@type":"BreadcrumbList","@id":"https:\/\/www.7rsa.pl\/en\/blog\/187045-fiege-moves-into-7r-warehouse-in-goleniow\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.7rsa.pl\/en\/"},{"@type":"ListItem","position":2,"name":"FIEGE moves into 7R warehouse in Goleni\u00f3w"}]},{"@type":"WebSite","@id":"https:\/\/www.7rsa.pl\/en\/#website","url":"https:\/\/www.7rsa.pl\/en\/","name":"Grupa 7R - deweloper wysokiej jako\u015bci magazyn\u00f3w","description":"Magazyny logistyczne i hale magazynowe do wynaj\u0119cia - 7R","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.7rsa.pl\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/ee45992ea97c22248abec8d01d4e80f0","name":"Admin Delante","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.7rsa.pl\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/88ec0d5fda7c1ee1a35d15a6d518571b87e3b421d42e7307e6e0b0cdaffb86fd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/88ec0d5fda7c1ee1a35d15a6d518571b87e3b421d42e7307e6e0b0cdaffb86fd?s=96&d=mm&r=g","caption":"Admin Delante"},"url":"https:\/\/www.7rsa.pl\/en\/blog\/author\/delante-dev\/"}]}},"_links":{"self":[{"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/posts\/5035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/comments?post=5035"}],"version-history":[{"count":2,"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/posts\/5035\/revisions"}],"predecessor-version":[{"id":5038,"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/posts\/5035\/revisions\/5038"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/media\/4371"}],"wp:attachment":[{"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/media?parent=5035"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/categories?post=5035"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.7rsa.pl\/en\/wp-json\/wp\/v2\/tags?post=5035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}