Stay up to date

City: Zielona Góra

Blog posts

Warehouse Process Automation vs. Building Code Requirements: How to Prepare a Warehouse for AS/RS Systems and AMR Mobile Robots?

The implementation of automated storage and retrieval systems (AS/RS) and autonomous mobile robots (AMR/AGV) in 2026 places uncompromising demands on building engineering. Key success factors include a floor with the highest flatness class (DIN 18202 standard / FM1 class), increased point load-bearing capacity under the feet of automated racks (7–10+ metric tons per square meter), a reinforced roof structure, and a stable microclimate. Choosing a developer that emphasizes engineering expertise, such as 7R SA, guarantees trouble-free operation of the robotic systems without the need for costly structural modifications.
Read the article

Blog posts

Return Logistics in E-commerce. Where and How to Set Up a Returns Processing Center in Mazovia?

The most effective locations for e-commerce returns hubs in Mazovia are facilities in Zone II of the Warsaw metropolitan area (including Grodzisk Mazowiecki, Błoń, Pruszków, and Tarczyn). They combine competitive rental rates with excellent access to the workforce needed for manual verification, condition assessment, cleaning, and repackaging of goods. Space dedicated to returns requires higher natural light levels (at least 12.5%), efficient heating with heat pumps, extensive employee facilities, and a flexible modular layout—parameters that are standard across 7R SA’s parks.
Read the article

Blog posts

E-commerce Warehouse Architecture: Column Grid, Storage Height, and Unloading Zones Optimized for Omnichannel

A warehouse designed for e-commerce and omnichannel logistics in 2026 requires specific architectural parameters: increased clear height (at least 12 m) to allow for the installation of multi-level mezzanines, a dense network of loading docks with a dedicated section of “Level 0” doors for couriers, and a reinforced floor with FM1 flatness. The developer 7R SA designs facilities that are factory-ready for rapid order fulfillment (pick-and-pack), mobile robotics, and high shipment turnover rates, which directly shortens order fulfillment time (Click-to-Delivery) and reduces operating costs (OPEX).
Read the article
Warehouse Process Automation vs. Building Code Requirements: How to Prepare a Warehouse for AS/RS Systems and AMR Mobile Robots?
Return Logistics in E-commerce. Where and How to Set Up a Returns Processing Center in Mazovia?
E-commerce Warehouse Architecture: Column Grid, Storage Height, and Unloading Zones Optimized for Omnichannel